Structural Alterations, Extension Demolition & Site Preparation

Croydon Townhouse Opening-Up, Structural Works & Groundworks

Croydon, South London

Structural alterations, foundation excavation and site preparation were completed over a ten-day programme, leaving the site ready for the builder to begin the extension.

Foundation opening-up work at the Croydon townhouse.

Location

Croydon, South London

Primary service

Structural Alterations, Extension Demolition

Confirmed scope

Rear opening-up works and Structural steel installation

Handover

Structural alterations, foundation excavation and site preparation were completed over a ten-day programme, leaving the site ready for the builder to begin the extension.

The client’s objective

Prepare a three-storey townhouse for a rear extension and the next construction stage.

The existing site

A three-storey townhouse was opened up at the rear, structurally altered and prepared for an extension despite sloping-garden access.

What mattered on this project

The rear garden sloped significantly, making access difficult for machinery and spoil removal while neighbouring properties required consideration.

Our approach

The rear of the property was opened up in accordance with structural engineer drawings, structural steel was installed, foundations were excavated and spoil was removed in a planned sequence.

01

Plan the agreed work

The rear garden sloped significantly, making access difficult for machinery and spoil removal while neighbouring properties required consideration.

02

Complete the removal

The rear of the property was opened up in accordance with structural engineer drawings, structural steel was installed, foundations were excavated and spoil was removed in a planned sequence.

03

Clear and hand back

Excavated spoil was removed as part of the agreed material-handling and site-preparation works.

Have a similar project?Send photos for an initial review

Project images

Croydon Townhouse Opening-Up, Structural Works & Groundworks

A three-storey townhouse was opened up at the rear, structurally altered and prepared for an extension despite sloping-garden access.

Foundation opening-up work at the Croydon townhouse.
Foundation opening-up work at the Croydon townhouse.
Foundation trench during the Croydon townhouse works.
Foundation trench during the Croydon townhouse works.
Temporary supports during structural works at the Croydon townhouse.
Temporary supports during structural works at the Croydon townhouse.

The result

Completed work

Rear opening-up works, Structural steel installation, Foundation excavation, Spoil removal and material handling, Site preparation.

Ready for the next stage

Excavated spoil was removed as part of the agreed material-handling and site-preparation works.

Ready for the next stage

Structural alterations, foundation excavation and site preparation were completed over a ten-day programme, leaving the site ready for the builder to begin the extension.

Planning structural openings and steelwork?

Send the postcode, photographs, structural drawings and access details so the scope can be assessed properly.