What information is needed for a demolition quote?
A postcode, photographs, a clear scope and any available drawings or surveys give a demolition contractor the right starting point.
Read the guideAdvice and guides
These guides explain the questions that commonly affect scope, access, specialist input and the next step. They are practical starting points, not legal, engineering, planning, ecological or asbestos advice.
What to prepare before requesting a quotation, and what affects the cost.
A postcode, photographs, a clear scope and any available drawings or surveys give a demolition contractor the right starting point.
Read the guideGarage demolition costs depend on the structure, access, materials, waste arrangements and the condition required when the work is complete.
Read the guideDemolition can be physically quick to execute, but the preparation required before work starts often takes longer than the demolition itself.
Read the guideDemolition cost is driven by what is being removed, how it is constructed, how waste leaves the site and what condition is required at handover — not by floor area alone.
Read the guideRegulatory checks, surveys and notifications that should be resolved before work begins.
Where asbestos could be present, the appropriate survey and professional advice must be obtained before relevant demolition or refurbishment work begins.
Read the guideA Section 80 notice under the Building Act 1984 may be required before demolition begins. The requirement and any exemptions depend on the specific work and circumstances.
Read the guideDemolition or structural work close to a shared boundary may engage the Party Wall etc. Act 1996. The legal position depends on the work and the relationship between the properties.
Read the guideService isolation responsibilities should be confirmed in writing before demolition, strip-out or structural work begins. Do not assume services are disconnected.
Read the guideNot every demolition project needs a bat survey, but the risk depends on the structure, location, evidence and proposed work. Early assessment avoids late programme constraints.
Read the guidePlanning requirements for demolition vary by property, location, scope and any local constraints. The position should be checked for the individual project before the programme is fixed.
Read the guideBefore demolition begins, a series of practical and regulatory steps must be completed. Not every project requires every step, but identifying which apply early prevents them from becoming programme risks.
Read the guideHow structural removal, concrete and foundation work is scoped and sequenced.
Removing a load-bearing wall requires structural design, temporary support and building-control steps that are separate from the demolition and installation work itself.
Read the guideConcrete removal depends on thickness, reinforcement, access, removal method and waste route. The scope should be confirmed before quoting.
Read the guideOpening-up exposes concealed existing construction so that a designer or structural engineer can confirm the actual condition before finalising the solution.
Read the guideUnexpected conditions should be exposed, identified and assessed before the affected operation continues. A variation should reflect a genuine change from the information and assumptions on which the original scope was priced.
Read the guideScoping internal strip-out, protecting retained elements and agreeing the handover boundary.
A clear strip-out scope protects retained elements and gives the next contractor a useful starting point.
Read the guideIndustry terminology for removal work is used inconsistently. The written scope and agreed handover condition matter more than the label alone.
Read the guideWork beside retained or occupied areas depends on an agreed scope, careful sequencing, protection, access planning and clear responsibilities before work begins.
Read the guideWaste routes, material reuse and preparing the site for the next contractor.
Waste arrangements should be planned around the materials, access route and agreed scope — not assumed after work starts.
Read the guideA useful handover starts with agreeing what the next contractor needs: clear areas, retained elements, access, levels and any remaining risks.
Read the guideStrip-out, dilapidations and enabling works for commercial and industrial projects.
Commercial fit-out terms describe different starting and handover conditions. The lease, Schedule of Dilapidations and agreed specification determine the actual strip-out scope.
Read the guideSend the postcode, photographs, scope and any available drawings or surveys. The assessment can then focus on the actual site rather than a generic scenario.