The short answer
Before an internal strip-out, identify what is being removed, what must remain, who is responsible for service isolation and the condition required for handover. Kitchens, bathrooms, finishes, partitions and services often overlap — a clear sequence reduces the risk of removing something that must be retained or leaving something that must go.
Why it matters
Strip-out work is often the first trade on a refurbishment programme. The condition in which the site is handed over directly affects the next contractor's ability to start. Ambiguity about retained elements, service responsibilities or waste arrangements tends to surface as a variation once work has started.
Information that may be needed
Plans, photographs, service information, asbestos information and any structural or refurbishment drawings may be relevant. Where a main contractor or architect is involved, their requirements for the handover condition should be confirmed before the strip-out scope is finalised.
What can affect the scope
Retained finishes, access, waste routes, service responsibilities, asbestos information and the next contractor's requirements can all affect the scope. The strip-out boundary — what is included and what is excluded — should be stated explicitly in the written quotation.
When specialist input may be needed
A structural engineer, asbestos professional, utility specialist or building-control adviser may be needed depending on the work. Where the strip-out includes structural elements, suitable engineer information should be available before that part of the scope begins.