1. Review the fit-out scope
Confirm the areas, redundant elements, retained systems and intended refurbishment handover.
Core service
Commercial strip-out planned around access, retained elements, waste logistics and programme deadlines.
We plan the work around your site, access, waste removal and the finish needed for the next stage.
This service is suitable for landlords, tenants, property managers, main contractors, developers and fit-out contractors. The scope is built around the project information, retained elements and the condition needed for the next stage.
Commercial strip-out prepares offices, retail units and other suitable commercial interiors for refurbishment or reconfiguration. The work removes agreed redundant fit-out while protecting landlord systems, shared services and retained areas that need to remain operational.
A scope may include partitions, suspended ceilings, raised-access flooring, floor coverings, counters, joinery, kitchens and redundant fit-out. M&E removal follows suitable isolation and is coordinated through appropriate trades where required; this service does not claim specialist M&E work directly.
Commercial work is shaped by loading bays, lift bookings, permits, security procedures, restricted working hours and occupied neighbours. These requirements are reviewed before the removal sequence is agreed, along with dust, noise, vibration and the route for waste through shared areas.
Landlord systems, fire alarms, sprinklers and shared services may need to remain operational. The scope identifies what is redundant and what remains, while appropriate trades coordinate any required isolation. Photographic records can be included where the client or building manager requires them.
Waste is planned around the building’s access and loading arrangements. Floor finishes, ceiling materials, metal, timber, furniture and mixed construction waste may require separate handling. Secure storage and removal timing are considered so the work does not obstruct shared routes or compromise site security.
Commercial strip-out prepares a premises for refurbishment. Commercial Dilapidations & End-of-Lease Reinstatement performs the agreed physical lease-end or landlord handback works. Lease interpretation and legal schedules remain with the client and their appointed advisers.
No unverified commercial project is presented as evidence. The service is explained through commercial access, retained-system, waste and phased-handover requirements.
Confirm the areas, redundant elements, retained systems and intended refurbishment handover.
Coordinate permits, security, loading, lifts, working hours and waste arrangements with the relevant contacts.
Plan around retained landlord systems and coordinate appropriate trades for services that need isolation.
Complete the planned removal of partitions, ceilings, floors, counters, joinery and other listed items.
Remove waste, provide records where included and inspect each agreed area for the following fit-out team.
The handover may be a cleared shell, a phased floorplate, a retained-services condition or another defined state for the next fit-out contractor. Cleaning, making good, specialist M&E works and landlord approvals are included only where stated.
No residential project is used to imply commercial experience. This page uses neutral authority imagery and process-led guidance rather than an unverified commercial case study.
The scope can include agreed partitions, suspended ceilings, raised floors, floor coverings, counters, joinery, kitchens and redundant fit-out.
Yes. Retained fire alarms, sprinklers, shared services and landlord systems are identified before work, with any required isolation coordinated through appropriate trades.
Yes, subject to building bookings, permits, security procedures, working hours and the available waste route.
Specialist M&E work is not assumed. Appropriate trades coordinate isolation or removal where required by the agreed scope.
Commercial strip-out prepares premises for refurbishment. Commercial dilapidations focuses on physical lease-end or landlord handback works.
No. Lease interpretation, legal schedules and liability remain with the client and their appointed advisers.
These focused services sit within this wider scope and can be assessed as part of the same project.
Selective or complete removal of kitchens, bathrooms, finishes, partitions and redundant interiors.
ExploreClearance of demolition debris, redundant structures and agreed materials for the next stage of work.
ExploreControlled openings and load-bearing wall removal from suitable structural engineer information.
ExploreAccess, loading, waste routes and operational constraints are reviewed as part of the project assessment and written scope.
Not ready for a full quote?
Get a guide range for your project using our demolition calculator. Answer a few project questions, then enter your contact details to see your guide range.
Get a Guide Price