The client’s objective
Prepare a four-storey townhouse for full refurbishment, basement excavation and modernisation on behalf of a property investor.
The existing site
A four-storey Islington townhouse was prepared for full refurbishment through complete internal strip-out, staircase removal, structural alterations and basement excavation.
What mattered on this project
The work had to coordinate a complete strip-out, four-storey staircase removal, structural steelwork and basement excavation within a townhouse refurbishment programme.
Our approach
The property was stripped back to its structural shell, the original staircase was dismantled across four floors, structural steelwork was installed to engineer design and the basement was excavated to improve headroom.
Plan the agreed work
The work had to coordinate a complete strip-out, four-storey staircase removal, structural steelwork and basement excavation within a townhouse refurbishment programme.
Complete the removal
The property was stripped back to its structural shell, the original staircase was dismantled across four floors, structural steelwork was installed to engineer design and the basement was excavated to improve headroom.
Clear and hand back
Waste arrangements were managed as part of the agreed enabling-works package.