Internal Strip-Out, Excavation & Site Preparation

Renovation Enabling Works in Ascot

Ascot, Berkshire

The property was left stripped and prepared for renovation, with the extension areas, foundation excavation, localised underpinning, roof opening and external preparation ready for the following construction stages.

Property in Ascot before renovation enabling works.

Location

Ascot, Berkshire

Primary service

Internal Strip-Out, Excavation

Confirmed scope

Internal strip-out throughout the property and Rear garden clearance and preparation for future landscaping

Handover

left stripped and prepared for renovation, with the extension areas, foundation excavation, localised underpinning, roof opening and external preparation ready for the following construction stages.

The client’s objective

Prepare the property for its renovation and extension programme by completing the agreed strip-out, excavation and enabling works before the main construction stages began.

The existing site

Internal strip-out, extension excavation, underpinning and site preparation for the conversion of a three-bedroom property into a five-bedroom home.

What mattered on this project

Access to the property and rear working area was limited, requiring controlled sequencing of strip-out materials, excavation, waste movement and site preparation.

Our approach

Internal finishes and relevant non-retained elements were removed to prepare the house for renovation. Rear and side areas were excavated for the planned extensions and reinforced slab foundation, alongside localised underpinning to one corner and opening up part of the catslide roof for a new dormer.

01

Plan the agreed work

Access to the property and rear working area was limited, requiring controlled sequencing of strip-out materials, excavation, waste movement and site preparation.

02

Complete the removal

Internal finishes and relevant non-retained elements were removed to prepare the house for renovation. Rear and side areas were excavated for the planned extensions and reinforced slab foundation, alongside localised underpinning to one corner and opening up part of the catslide roof for a new dormer.

03

Clear and hand back

Strip-out materials, excavation and site preparation were sequenced around the limited-access working conditions.

Have a similar project?Send photos for an initial review

Project images

Ascot Renovation Enabling Works

Internal strip-out, extension excavation, underpinning and site preparation for the conversion of a three-bedroom property into a five-bedroom home.

Property in Ascot before renovation enabling works.
Property in Ascot before renovation enabling works.
Internal strip-out in progress at the Ascot property.
Internal strip-out in progress at the Ascot property.
Ground-floor strip-out at the Ascot property.
Ground-floor strip-out at the Ascot property.
Roof area prepared for the planned dormer at the Ascot property.
Roof area prepared for the planned dormer at the Ascot property.
Roof space opened up at the Ascot property.
Roof space opened up at the Ascot property.
Roof strip-out at the Ascot property.
Roof strip-out at the Ascot property.
External work area at the Ascot property before final clearance.
External work area at the Ascot property before final clearance.
Prepared work area at the Ascot property.
Prepared work area at the Ascot property.

The result

Completed work

Internal strip-out throughout the property, Rear garden clearance and preparation for future landscaping, Excavation for proposed side and rear extensions, Foundation excavation for a reinforced slab, Localised underpinning to one corner of the existing property, Opening up part of the catslide roof for a new dormer, Site preparation and clearance for following construction stages.

Ready for the next stage

Strip-out materials, excavation and site preparation were sequenced around the limited-access working conditions.

Ready for the next stage

The property was left stripped and prepared for renovation, with the extension areas, foundation excavation, localised underpinning, roof opening and external preparation ready for the following construction stages.

Planning renovation enabling works?

Send the postcode, photographs, drawings and access details so the agreed strip-out, excavation and handover can be assessed properly.