1. Confirm the room scope
Identify the fittings, finishes, retained services and handover condition for the bathroom.
Core service
Removal of sanitaryware, cabinets, tiles and non-retained finishes ahead of bathroom refurbishment.
We plan the work around your site, access, waste removal and the finish needed for the next stage.
This service is suitable for homeowners, landlords, builders and bathroom installers. The scope is built around the project information, retained elements and the condition needed for the next stage.
Bathroom strip-out prepares a bathroom for refurbishment by removing the agreed fittings and finishes in a controlled sequence. The scope can include baths, shower trays, screens, sanitaryware, vanity units, fitted furniture, accessories, wall tiles, floor finishes, plasterboard, boxing and non-structural linings where specified.
The work is planned around retained pipework, drainage, ventilation, heating and adjacent finishes. It is not a bathroom-refitting service: plumbing installation, electrical installation, drying, mould remediation and new bathroom works remain with the appropriate following trades unless separately arranged.
Before quotation, useful information includes photographs, room dimensions, the intended handover, known water damage, available survey information and the isolation status of plumbing and electrical services. Baths, showers, basins, toilets and connected appliances should not be disturbed until the relevant services are suitably managed by appropriate competent trades.
Pipework, drainage, ventilation and heating that are to remain are identified before removal. In occupied homes and flats, floors, stairs, corridors and common areas can be protected, while dust control and a debris route are planned around the actual access.
Bathroom removal produces mixed waste including ceramic sanitaryware, tiles, plasterboard, timber, metal and floor finishes. The removal route and waste handling are planned before work starts, particularly where the bathroom is on an upper floor or access is restricted.
Tanking, membranes and concealed water damage may only become apparent once finishes are removed. The scope can be reviewed if conditions differ from the available information. Bathroom strip-out removes the agreed existing elements; it does not include drying, remediation, new plumbing, electrical work or bathroom refitting.
Chertsey is shown because its verified record includes bathroom strip-out and exposed floor-joist work. No additional project card is used without a relevant recorded scope.
View All ProjectsIdentify the fittings, finishes, retained services and handover condition for the bathroom.
Confirm plumbing and electrical isolation arrangements through the appropriate competent trades.
Set out protection, dust controls and a route for debris through the property or common areas.
Take out the agreed sanitaryware, furniture, tiles, boxing, linings and floor finishes in a controlled order.
Remove waste and leave the stated condition ready for plumbing, electrical or installation work.
The handover may be a cleared bathroom, exposed wall and floor backgrounds, retained pipework or another stated condition for the next contractor. New bathroom installation, service alterations, drying, mould remediation, tanking and finishes are not included unless expressly specified.
Chertsey is the principal evidence because its verified record includes bathroom strip-out and exposed floor-joist work. No additional project is used without a recorded bathroom-removal scope.
It can include agreed baths, shower trays, screens, sanitaryware, vanity units, tiles, floor finishes, boxing and non-structural linings.
Yes. Suitable isolation must be confirmed through appropriate competent trades before connected fittings are removed.
Yes, when they are included in the agreed scope. Concealed backgrounds, membranes and water damage may require further review once exposed.
Yes, subject to access, common-area protection, upper-floor debris routes, dust control and building requirements.
No. Bathroom strip-out prepares the room for the following plumbing, electrical and installation trades.
The agreed handover may be a cleared room or exposed backgrounds ready for the following trades, with retained services identified.
Selective or complete removal of kitchens, bathrooms, finishes, partitions and redundant interiors.
ExploreCareful removal of kitchens, appliances and associated finishes ahead of refurbishment or structural work.
ExploreDefined removal work that prepares a home for major refurbishment while protecting agreed retention items.
ExploreYes. The room can be stripped back to the agreed condition so the bathroom installer and following trades can begin their work.