What information do you need to quote a demolition job?
Start with the site postcode, photographs of the structure and access route, a description of what must be removed and what must remain, and any available plans or surveys. We will confirm whether we can price from the information provided or need a site visit.
What information is needed for a quoteIs waste removal included in the price?
Waste removal is included unless the written quotation states otherwise or the client has chosen to provide skips or another agreed arrangement. The method — skips, wait-and-load, grab lorry — depends on access and is agreed before work starts.
Demolition waste disposal: planning the route outDo I need an asbestos survey before demolition?
Where asbestos could be present in the area being disturbed, a refurbishment and demolition survey must be carried out by a competent professional before work begins. The requirement depends on the age of the building and the areas being disturbed.
Asbestos surveys: what to knowDo I need planning permission for demolition?
It depends on the property, the extent of the work and any designations that apply. Some demolition is permitted development; some requires prior approval or full planning permission. The position should be checked for the individual project before the programme is fixed.
Planning permission for demolitionCan you carry out structural wall removal and steel installation?
Yes, where suitable structural engineer drawings and calculations are available. The contractor carries out the removal, temporary support and steel installation to the engineer's specification. The written scope will state what is included.
View structural alterationsWho is responsible for service disconnections?
The written scope confirms responsibilities for service isolations. Do not assume utilities are disconnected unless this is expressly agreed before work begins. Some disconnections require the network operator to attend site.
Service disconnections: who does whatCan you work on sites with restricted access or no space for a skip?
Yes, subject to assessment. Restricted access affects labour, programme and waste costs and must be identified before quoting. Scheduled wait-and-load collections may be suitable where skips cannot be placed.
View a Clapham projectDo you work for homeowners and contractors?
Yes. The Demo Squad works directly for homeowners, builders, developers, property managers and commercial clients across Surrey, London and surrounding areas.
About and capabilitiesWhat areas do you cover?
The Demo Squad is based in Chertsey and regularly works across Surrey, London, Berkshire, Hampshire, West Sussex and surrounding areas. Send the postcode and scope to confirm availability.
View coverageHow long does demolition take?
The physical work can be quick, but surveys, service arrangements, access and any required notices often determine the overall programme. The right timescale depends on the specific scope and site constraints.
How long demolition can takeWhat affects the cost of demolition?
Cost depends on the structure, access, waste route, retained elements, surveys, service arrangements and required handover condition. A written quotation should reflect the actual project rather than a generic rate.
What affects demolition costWhat does back-to-shell mean for a commercial unit?
Back-to-shell usually describes removal back to an agreed base condition. The lease, Schedule of Dilapidations, drawings and landlord requirements determine what is actually included.
CAT A, CAT B and back-to-shell explainedCan demolition work be planned around occupied or retained areas?
Yes, subject to assessment. The scope should identify retained areas, access, service isolation, protection, waste movement and agreed controls for the specific building.
Working around retained or occupied buildings